Wind farm

Staffelstein wind farm

Staffelstein wind farm is a wind farm in Germany with a capacity of 12 MW, commissioned in 2002. It is operating and is owned by EnerVest AG.

In 2024 it settled 7.3 GWh of electricity, a load factor of 7.0%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
7.0%
This assetCohort median 16.3%Middle half

This asset produced at 7.0% of nameplate in 2024 — the 2nd percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
12 MW
Country
Germany
Status
operating
Commissioned
2002
Owner
EnerVest AG
Technology
Onshore
Measured output 2024
7.3 GWh
Load factor
7.0%
Peer percentile
2nd
Grid connection
MS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE979154551426); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets