Wind farm

Vierschau wind farm

Vierschau wind farm is a wind farm in Germany with a capacity of 12 MW, commissioned in 2011. It is operating and is owned by WPD AG.

In 2024 it settled 17.5 GWh of electricity, a load factor of 16.6%. Part of that volume was sold outside EEG support, so it is partly merchant.

Its EEG support ran to the end of 2023.

Measured performance vs peers
16.6%
This assetCohort median 21.9%Middle half

This asset produced at 16.6% of nameplate in 2024 — the 12th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
12 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
WPD AGresearched
Technology
Onshore
Measured output 2024
17.5 GWh
Load factor
16.6%
EEG support ends
2023
Peer percentile
12th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against wpd.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets