Wind farm

Falkenhöhe wind farm

Falkenhöhe wind farm is a wind farm in Germany with a capacity of 13 MW, commissioned in 2021. It is operating and is owned by RES.

In 2024 it settled 23.4 GWh of electricity, a load factor of 20.5%. That volume was settled under EEG support.

Its EEG support runs to the end of 2041, after which that output is sold at market prices.

Measured performance vs peers
20.5%
This assetCohort median 23.8%Middle half

This asset produced at 20.5% of nameplate in 2024 — the 29th percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
13 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
RESresearched
Technology
Onshore
Measured output 2024
23.4 GWh
Load factor
20.5%
EEG support ends
2041
Peer percentile
29th
Grid connection
MS
State
Baden-Württemberg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against windpark-falkenhoehe.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets