Görzig Ost wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2021. It is operating and is owned by Trianel Windpark Görzig GmbH & Co. KG.

In 2024 it settled 29.7 GWh of electricity, a load factor of 24.2%. That volume was settled under EEG support.

Its EEG support runs to the end of 2042, with later phases to 2043, after which that output is sold at market prices.

Measured performance vs peers
24.2%
This assetCohort median 23.8%Middle half

This asset produced at 24.2% of nameplate in 2024 — the 52nd percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
Trianel Windpark Görzig GmbH & Co. KG
Technology
Onshore
Measured output 2024
29.7 GWh
Load factor
24.2%
EEG support ends
2042
Peer percentile
52nd
Grid connection
HS/MS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE906112027617); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets