Wind farm

Holstenniendorf wind farm

Holstenniendorf wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2023. It is operating and is owned by Windpark Holsteniendorf GmbH & Co. KG.

In 2024 it settled 12.9 GWh of electricity, a load factor of 9.8%. Part of that volume was sold outside EEG support, so it is partly merchant.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
9.8%
This assetCohort median 23.8%Middle half

This asset produced at 9.8% of nameplate in 2024 — the 3rd percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
15 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Windpark Holsteniendorf GmbH & Co. KG
Technology
Onshore
Measured output 2024
12.9 GWh
Load factor
9.8%
EEG support ends
2043
Peer percentile
3rd
Grid connection
HS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE925226906618); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets