Hünfeldener Wald wind farm

Hünfeldener Wald wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2020. It is operating and is owned by Bürgerwindpark Hünfeldener Wald GmbH Co. KG.

In 2024 it settled 16.4 GWh of electricity, a load factor of 13.4%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Its EEG support runs to the end of 2040, after which that output is sold at market prices.

Measured performance vs peers
13.4%
This assetCohort median 23.8%Middle half

This asset produced at 13.4% of nameplate in 2024 — the 8th percentile of German wind commissioned 2020 or later (140 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Bürgerwindpark Hünfeldener Wald GmbH Co. KG
Technology
Onshore
Measured output 2024
16.4 GWh
Load factor
13.4%
EEG support ends
2040
Peer percentile
8th
Grid connection
MS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE924628522716); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets