Wind farm

Remlingen (Bavaria) wind farm

Remlingen (Bavaria) wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2012. It is operating and is owned by Mainova Windpark Remlingen GmbH & Co. KG.

In 2024 it settled 28.7 GWh of electricity, a load factor of 23.4%. That volume was settled under EEG support.

Its EEG support runs to the end of 2032, with later phases to 2033, after which that output is sold at market prices.

Measured performance vs peers
23.4%
This assetCohort median 21.9%Middle half

This asset produced at 23.4% of nameplate in 2024 — the 65th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
Mainova Windpark Remlingen GmbH & Co. KG
Technology
Onshore
Measured output 2024
28.7 GWh
Load factor
23.4%
EEG support ends
2032
Peer percentile
65th
Grid connection
HS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE941824608037); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets