Wind farm

Saidenberg wind farm

Saidenberg wind farm is a wind farm in Germany with a capacity of 19 MW, commissioned in 2022. It is operating and is owned by UKA Group.

In 2024 it settled 41.4 GWh of electricity, a load factor of 24.9%. That volume was settled under EEG support.

Its EEG support ran to the end of 2022.

Measured performance vs peers
24.9%
This assetCohort median 23.8%Middle half

This asset produced at 24.9% of nameplate in 2024 — the 61st percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
19 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
UKA Groupresearched
Technology
Onshore
Measured output 2024
41.4 GWh
Load factor
24.9%
EEG support ends
2022
Peer percentile
61st
Grid connection
MS
State
Sachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against uka-gruppe.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets