Waldhausen wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2007. It is operating and is owned by EnBW Energie Baden-Württemberg AG.

In 2024 it settled 20.9 GWh of electricity, a load factor of 17.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2026, with later phases to 2027, after which that output is sold at market prices.

Measured performance vs peers
17.0%
This assetCohort median 16.3%Middle half

This asset produced at 17.0% of nameplate in 2024 — the 52nd percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2007
Owner
EnBW Energie Baden-Württemberg AGresearched
Technology
Onshore
Measured output 2024
20.9 GWh
Load factor
17.0%
EEG support ends
2026
Peer percentile
52nd
Grid connection
HS/MS
State
Baden-Württemberg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against enbw.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets