Wind farm

Breydin wind farm

Breydin wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2004. It is operating.

In 2024 it settled 11.0 GWh of electricity, a load factor of 8.4%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Capacity
15 MW
Country
Germany
Status
operating
Commissioned
2004
Owner
Technology
Onshore
Measured output 2024
11.0 GWh
Load factor
8.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap