Wind farm

Greiner Eck wind farm

Greiner Eck wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2017. It is operating and is owned by Windpark Greiner Eck.

In 2024 it settled 31.7 GWh of electricity, a load factor of 24.1%. That volume was settled under EEG support.

Its EEG support runs to the end of 2030, with later phases to 2037, after which that output is sold at market prices.

Measured performance vs peers
24.1%
This assetCohort median 24.7%Middle half

This asset produced at 24.1% of nameplate in 2024 — the 44th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
15 MW
Country
Germany
Status
operating
Commissioned
2017
Owner
Windpark Greiner Eck
Technology
Onshore
Measured output 2024
31.7 GWh
Load factor
24.1%
EEG support ends
2030
Peer percentile
44th
Grid connection
MS
State
Hessen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE927868433590); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets