Rohrenkopf wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2016. It is operating and is owned by EWS Windpark Rohrenkopf GmbH.
In 2024 it settled 38.1 GWh of electricity, a load factor of 29.0%. That volume was settled under EEG support.
Its EEG support runs to the end of 2036, with later phases to 2037, after which that output is sold at market prices.
This asset produced at 29.0% of nameplate in 2024 — the 79th percentile of German wind commissioned 2015-2019 (215 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE988568703048); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets