Thaden wind farm is a wind farm in Germany with a capacity of 15 MW, commissioned in 2022. It is operating and is owned by Juwi GmbH.
In 2024 it settled 34.0 GWh of electricity, a load factor of 25.9%. It sold essentially all of that volume outside EEG support — it is already merchant.
This asset produced at 25.9% of nameplate in 2024 — the 66th percentile of German wind commissioned 2020 or later (140 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against juwi.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets