Wind farm

Felde Windpark

Felde Windpark is a wind farm in Germany with a capacity of 17 MW, commissioned in 2019. It is operating and is owned by WPD AG.

In 2024 it settled 13.6 GWh of electricity, a load factor of 9.1%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Its EEG support runs to the end of 2039, after which that output is sold at market prices.

Measured performance vs peers
9.1%
This assetCohort median 24.7%Middle half

This asset produced at 9.1% of nameplate in 2024 — the 0th percentile of German wind commissioned 2015-2019 (215 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.

Capacity
17 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
WPD AGresearched
Technology
Onshore
Measured output 2024
13.6 GWh
Load factor
9.1%
EEG support ends
2039
Peer percentile
0th
Grid connection
HS/MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against wpd.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap