Wind farm

Hohenahr wind farm

Hohenahr wind farm is a wind farm in Germany with a capacity of 17 MW, commissioned in 2013. It is operating and is owned by ABO Wind AG.

In 2024 it settled 36.0 GWh of electricity, a load factor of 24.2%. That volume was settled under EEG support.

Its EEG support runs to the end of 2032, with later phases to 2033, after which that output is sold at market prices.

Measured performance vs peers
24.2%
This assetCohort median 21.9%Middle half

This asset produced at 24.2% of nameplate in 2024 — the 69th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
17 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
ABO Wind AGresearched
Technology
Onshore
Measured output 2024
36.0 GWh
Load factor
24.2%
EEG support ends
2032
Peer percentile
69th
Grid connection
MS
State
Hessen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against abo-wind.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets