Wind farm

Siegfriedeiche wind farm

Siegfriedeiche wind farm is a wind farm in Germany with a capacity of 17 MW, commissioned in 2020. It is operating and is owned by MVV Energie AG.

In 2024 it settled 31.1 GWh of electricity, a load factor of 20.9%. That volume was settled under EEG support.

Its EEG support runs to the end of 2040, after which that output is sold at market prices.

Measured performance vs peers
20.9%
This assetCohort median 23.8%Middle half

This asset produced at 20.9% of nameplate in 2024 — the 32nd percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
17 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
MVV Energie AGresearched
Technology
Onshore
Measured output 2024
31.1 GWh
Load factor
20.9%
EEG support ends
2040
Peer percentile
32nd
Grid connection
MS
State
Hessen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against mvv.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets