Wind farm

Workerszeller Forst wind farm

Workerszeller Forst wind farm is a wind farm in Germany with a capacity of 17 MW, commissioned in 2017. It is operating and is owned by Ostwind.

In 2024 it settled 19.4 GWh of electricity, a load factor of 13.0%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Its EEG support runs to the end of 2037, after which that output is sold at market prices.

Measured performance vs peers
13.0%
This assetCohort median 24.7%Middle half

This asset produced at 13.0% of nameplate in 2024 — the 2nd percentile of German wind commissioned 2015-2019 (215 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.

Capacity
17 MW
Country
Germany
Status
operating
Commissioned
2017
Owner
Ostwindresearched
Technology
Onshore
Measured output 2024
19.4 GWh
Load factor
13.0%
EEG support ends
2037
Peer percentile
2nd
Grid connection
HS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against ostwind.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets