Wind farm

Diekhusen-Fahrstedt Windpark

Diekhusen-Fahrstedt Windpark is a wind farm in Germany with a capacity of 18 MW, commissioned in 2016. It is operating and is owned by BWP DFS.

In 2024 it settled 46.0 GWh of electricity, a load factor of 29.2%. That volume was settled under EEG support.

Its EEG support runs to the end of 2036, after which that output is sold at market prices.

Measured performance vs peers
29.2%
This assetCohort median 24.7%Middle half

This asset produced at 29.2% of nameplate in 2024 — the 81st percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
18 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
BWP DFS
Technology
Onshore
Measured output 2024
46.0 GWh
Load factor
29.2%
EEG support ends
2036
Peer percentile
81st
Grid connection
MS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets