Eixen wind farm is a wind farm in Germany with a capacity of 18 MW, commissioned in 2006. It is operating and is owned by Denker & Wulf AG.
In 2024 it settled 20.7 GWh of electricity, a load factor of 13.1%. That volume was settled under EEG support.
Its EEG support runs to the end of 2026, with later phases to 2033, after which that output is sold at market prices.
This asset produced at 13.1% of nameplate in 2024 — the 29th percentile of German wind commissioned pre-2010 (182 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against denkerwulf.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets