Wind farm

Ostercappeln wind farm

Ostercappeln wind farm is a wind farm in Germany with a capacity of 18 MW, commissioned in 2016. It is operating and is owned by EnBW Windkraftprojekte GmbH.

In 2024 it settled 18.6 GWh of electricity, a load factor of 11.8%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
11.8%
This assetCohort median 24.7%Middle half

This asset produced at 11.8% of nameplate in 2024 — the 1st percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
18 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
EnBW Windkraftprojekte GmbH
Technology
Onshore
Measured output 2024
18.6 GWh
Load factor
11.8%
Peer percentile
1st
Grid connection
HS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE919766239817); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets