Wind farm

Kirchwistedt wind farm

Kirchwistedt wind farm is a wind farm in Germany with a capacity of 16 MW, commissioned in 2006. It is operating and is owned by REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG.

In 2024 it settled 11.8 GWh of electricity, a load factor of 8.4%. That volume was settled under EEG support.

Its EEG support ran to the end of 2025.

Measured performance vs peers
8.4%
This assetCohort median 16.3%Middle half

This asset produced at 8.4% of nameplate in 2024 — the 7th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
16 MW
Country
Germany
Status
operating
Commissioned
2006
Owner
REG Regenerative Energien Standortentwicklung GmbH & Co. Kirchwistedt KG
Technology
Onshore
Measured output 2024
11.8 GWh
Load factor
8.4%
EEG support ends
2025
Peer percentile
7th
Grid connection
HS/MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE985965057422); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap