Wind farm

Langwedel (Lerak) wind farm

Langwedel (Lerak) wind farm is a wind farm in Germany with a capacity of 20 MW, commissioned in 2009. It is operating and is owned by PNE AG.

In 2024 it settled 43.1 GWh of electricity, a load factor of 24.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, with later phases to 2033, after which that output is sold at market prices.

Measured performance vs peers
24.6%
This assetCohort median 16.3%Middle half

This asset produced at 24.6% of nameplate in 2024 — the 89th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
20 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
PNE AGresearched
Technology
Onshore
Measured output 2024
43.1 GWh
Load factor
24.6%
EEG support ends
2029
Peer percentile
89th
Grid connection
HS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against pne-ag.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets