Wind farm

Neu Guthendorf wind farm

Neu Guthendorf wind farm is a wind farm in Germany with a capacity of 20 MW, commissioned in 2018. It is operating and is owned by Windpark Neu Guthendorf GmbH & Co. Betriebs KG.

In 2024 it settled 42.2 GWh of electricity, a load factor of 24.1%. That volume was settled under EEG support.

Its EEG support runs to the end of 2038, after which that output is sold at market prices.

Measured performance vs peers
24.1%
This assetCohort median 24.7%Middle half

This asset produced at 24.1% of nameplate in 2024 — the 44th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
20 MW
Country
Germany
Status
operating
Commissioned
2018
Owner
Windpark Neu Guthendorf GmbH & Co. Betriebs KG
Technology
Onshore
Measured output 2024
42.2 GWh
Load factor
24.1%
EEG support ends
2038
Peer percentile
44th
Grid connection
HS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE972422117966); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets