Puschwitz wind farm is a wind farm in Germany with a capacity of 20 MW, commissioned in 2017. It is operating and is owned by EnBW Windkraftprojekte GmbH.
In 2024 it settled 23.8 GWh of electricity, a load factor of 13.6%. It sold essentially all of that volume outside EEG support — it is already merchant.
This asset produced at 13.6% of nameplate in 2024 — the 3rd percentile of German wind commissioned 2015-2019 (215 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE968183048809); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets