Deinste wind farm is a wind farm in Germany with a capacity of 22 MW, commissioned in 2004. It is operating and is owned by Deinste-Helmste Wind GmbH & Co. KG.
In 2024 it settled 34.4 GWh of electricity, a load factor of 17.9%. That volume was settled under EEG support.
Its EEG support ran to the end of 2024.
This asset produced at 17.9% of nameplate in 2024 — the 60th percentile of German wind commissioned pre-2010 (182 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE981576839969); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets