Wind farm

Kuhstedt wind farm

Kuhstedt wind farm is a wind farm in Germany with a capacity of 22 MW, commissioned in 2022. It is operating and is owned by PNE AG.

In 2024 it settled 30.6 GWh of electricity, a load factor of 15.9%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
15.9%
This assetCohort median 23.8%Middle half

This asset produced at 15.9% of nameplate in 2024 — the 13th percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
22 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
PNE AGresearched
Technology
Onshore
Measured output 2024
30.6 GWh
Load factor
15.9%
Peer percentile
13th
Grid connection
HS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against pne-ag.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap