Linda wind farm is a wind farm in Germany with a capacity of 22 MW, commissioned in 2019. It is operating and is owned by Windpark Linda.

In 2024 it settled 24.8 GWh of electricity, a load factor of 12.9%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, with later phases to 2039, after which that output is sold at market prices.

Measured performance vs peers
12.9%
This assetCohort median 24.7%Middle half

This asset produced at 12.9% of nameplate in 2024 — the 2nd percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
22 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
Windpark Linda
Technology
Onshore
Measured output 2024
24.8 GWh
Load factor
12.9%
EEG support ends
2029
Peer percentile
2nd
Grid connection
HS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE907408635639); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets