Wind farm

Biegen wind farm

Biegen wind farm is a wind farm in Germany with a capacity of 24 MW, commissioned in 2022. It is operating and is owned by WPD AG.

In 2024 it settled 51.5 GWh of electricity, a load factor of 24.5%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
24.5%
This assetCohort median 23.8%Middle half

This asset produced at 24.5% of nameplate in 2024 — the 56th percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
24 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
WPD AGresearched
Technology
Onshore
Measured output 2024
51.5 GWh
Load factor
24.5%
Peer percentile
56th
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against wpd.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets