Wind farm

Thurnau wind farm

Thurnau wind farm is a wind farm in Germany with a capacity of 24 MW, commissioned in 2016. It is operating and is owned by VR Bank Nord eG.

In 2024 it settled 54.3 GWh of electricity, a load factor of 25.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2035, with later phases to 2036, after which that output is sold at market prices.

Measured performance vs peers
25.8%
This assetCohort median 24.7%Middle half

This asset produced at 25.8% of nameplate in 2024 — the 59th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
24 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
VR Bank Nord eG
Technology
Onshore
Measured output 2024
54.3 GWh
Load factor
25.8%
EEG support ends
2035
Peer percentile
59th
Grid connection
HS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE985031859806); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap