Wind farm

Pferdsfeld wind farm

Pferdsfeld wind farm is a wind farm in Germany with a capacity of 22 MW, commissioned in 2023. It is operating and is owned by BayWa R.E. AG.

In 2024 it settled 40.4 GWh of electricity, a load factor of 20.9%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
20.9%
This assetCohort median 23.8%Middle half

This asset produced at 20.9% of nameplate in 2024 — the 33rd percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
22 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
BayWa R.E. AGresearched
Technology
Onshore
Measured output 2024
40.4 GWh
Load factor
20.9%
EEG support ends
2043
Peer percentile
33rd
Grid connection
MS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against baywa-re.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets