Wind farm

Altes Lager wind farm

Altes Lager wind farm is a wind farm in Germany with a capacity of 32 MW, commissioned in 2009. It is operating.

In 2024 it settled 41.2 GWh of electricity, a load factor of 14.7%. Part of that volume was sold outside EEG support, so it is partly merchant.

Capacity
32 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
Technology
Onshore
Measured output 2024
41.2 GWh
Load factor
14.7%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap