Feldheim wind farm is a wind farm in Germany with a capacity of 32 MW, commissioned in 2006. It is operating and is owned by FP Lux Wind GmbH & Co. Feldheim V KG.
In 2024 it settled 61.7 GWh of electricity, a load factor of 22.0%. That volume was settled under EEG support.
Its EEG support runs to the end of 2035, with later phases to 2037, after which that output is sold at market prices.
This asset produced at 22.0% of nameplate in 2024 — the 84th percentile of German wind commissioned pre-2010 (182 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE945731266588); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets