Wind farm

Suckow wind farm

Suckow wind farm is a wind farm in Germany with a capacity of 33 MW, commissioned in 2013. It is operating and is owned by SüdWestStrom Windpark Suckow GmbH & Co KG.

In 2024 it settled 58.8 GWh of electricity, a load factor of 20.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2033, after which that output is sold at market prices.

Measured performance vs peers
20.3%
This assetCohort median 21.9%Middle half

This asset produced at 20.3% of nameplate in 2024 — the 34th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
33 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
SüdWestStrom Windpark Suckow GmbH & Co KGresearched
Technology
Onshore
Measured output 2024
58.8 GWh
Load factor
20.3%
EEG support ends
2033
Peer percentile
34th
Grid connection
HS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against expo21xx.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap