Wind farm

Berge-Lietzow-Nauen wind farm

Berge-Lietzow-Nauen wind farm is a wind farm in Germany with a capacity of 38 MW, commissioned in 2005. It is operating.

In 2024 it settled 52.5 GWh of electricity, a load factor of 15.8%. Part of that volume was sold outside EEG support, so it is partly merchant.

Capacity
38 MW
Country
Germany
Status
operating
Commissioned
2005
Owner
Technology
Onshore
Measured output 2024
52.5 GWh
Load factor
15.8%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap