Wind farm

Groß Eilstorf wind farm

Groß Eilstorf wind farm is a wind farm in Germany with a capacity of 51 MW, commissioned in 2011. It is operating and is owned by enercity.

In 2024 it settled 91.8 GWh of electricity, a load factor of 20.5%. That volume was settled under EEG support.

Its EEG support runs to the end of 2031, after which that output is sold at market prices.

Measured performance vs peers
20.5%
This assetCohort median 21.9%Middle half

This asset produced at 20.5% of nameplate in 2024 — the 39th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
51 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
enercityresearched
Technology
Onshore
Measured output 2024
91.8 GWh
Load factor
20.5%
EEG support ends
2031
Peer percentile
39th
Grid connection
HS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against gem.wiki; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap