Wind farm

Hüselitz wind farm

Hüselitz wind farm is a wind farm in Germany with a capacity of 56 MW, commissioned in 2015. It is operating and is owned by CPC Germania.

In 2024 it settled 102.1 GWh of electricity, a load factor of 20.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2035, with later phases to 2036, after which that output is sold at market prices.

Measured performance vs peers
20.8%
This assetCohort median 24.7%Middle half

This asset produced at 20.8% of nameplate in 2024 — the 19th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
56 MW
Country
Germany
Status
operating
Commissioned
2015
Owner
CPC Germaniaresearched
Technology
Onshore
Measured output 2024
102.1 GWh
Load factor
20.8%
EEG support ends
2035
Peer percentile
19th
Grid connection
HS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against gem.wiki; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets