Wind farm

Klettwitz wind farm

Klettwitz wind farm is a wind farm in Germany with a capacity of 89 MW, commissioned in 2015. It is operating and is owned by John Laing Group.

In 2024 it settled 164.1 GWh of electricity, a load factor of 21.1%. That volume was settled under EEG support.

Its EEG support runs to the end of 2027, with later phases to 2040, after which that output is sold at market prices.

Measured performance vs peers
21.1%
This assetCohort median 24.7%Middle half

This asset produced at 21.1% of nameplate in 2024 — the 21st percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
89 MW
Country
Germany
Status
operating
Commissioned
2015
Owner
John Laing Groupresearched
Technology
Onshore
Measured output 2024
164.1 GWh
Load factor
21.1%
EEG support ends
2027
Peer percentile
21st
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against gem.wiki; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets