Wind farm

Arcadis Ost wind farm

Arcadis Ost wind farm is a wind farm in Germany with a capacity of 257 MW, commissioned in 2023. It is operating.

In 2024 it settled 796.9 GWh of electricity, a load factor of 35.4%. That volume was settled under EEG support.

Capacity
257 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Technology
Offshore hard mount
Measured output 2024
796.9 GWh
Load factor
35.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap