Wind farm

Fuchstal Gemeindewald wind farm

Fuchstal Gemeindewald wind farm is a wind farm in Germany with a capacity of 17 MW, commissioned in 2024. It is operating and is owned by Ingenieurbüro Sing GmbH.

In 2024 it settled 20.1 GWh of electricity, a load factor of 13.5%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Peer comparison unavailable

Commissioned 2024, settled 2024 — a partial year of output over a full year of nameplate. Not comparable.

Capacity
17 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
Ingenieurbüro Sing GmbHresearched
Technology
Onshore
Measured output 2024
20.1 GWh
Load factor
13.5%
EEG support ends
2043
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against beteiligung.ib-sing.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap