Wind farm

Kaifenheim wind farm

Kaifenheim wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2016. It is operating and is owned by CPC Germania GmbH & Co KG.

In 2024 it settled 23.9 GWh of electricity, a load factor of 27.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2028, with later phases to 2036, after which that output is sold at market prices.

Measured performance vs peers
27.3%
This assetCohort median 24.7%Middle half

This asset produced at 27.3% of nameplate in 2024 — the 69th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
10 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
CPC Germania GmbH & Co KGresearched
Technology
Onshore
Measured output 2024
23.9 GWh
Load factor
27.3%
EEG support ends
2028
Peer percentile
69th
Grid connection
MS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against cpc-germania.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets