Wind farm

Kirchengel wind farm

Kirchengel wind farm is a wind farm in Germany with a capacity of 13 MW, commissioned in 2016. It is operating and is owned by PNE AG.

In 2024 it settled 23.9 GWh of electricity, a load factor of 21.0%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Its EEG support ran to the end of 2024.

Measured performance vs peers
21.0%
This assetCohort median 24.7%Middle half

This asset produced at 21.0% of nameplate in 2024 — the 21st percentile of German wind commissioned 2015-2019 (215 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.

Capacity
13 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
PNE AGresearched
Technology
Onshore
Measured output 2024
23.9 GWh
Load factor
21.0%
EEG support ends
2024
Peer percentile
21st
Grid connection
HS
State
Thüringen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against pne-ag.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets