Wind farm

Spremberg wind farm

Spremberg wind farm is a wind farm in Germany with a capacity of 13 MW, commissioned in 2016. It is operating and is owned by JWP Jade Windpark GmbH&Co. 27.Betriebs KG.

In 2024 it settled 22.4 GWh of electricity, a load factor of 19.7%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, with later phases to 2036, after which that output is sold at market prices.

Measured performance vs peers
19.7%
This assetCohort median 24.7%Middle half

This asset produced at 19.7% of nameplate in 2024 — the 15th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
13 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
JWP Jade Windpark GmbH&Co. 27.Betriebs KG
Technology
Onshore
Measured output 2024
22.4 GWh
Load factor
19.7%
EEG support ends
2029
Peer percentile
15th
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE921105276438); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets