Wind farm

Wadern-Wenzelstein wind farm

Wadern-Wenzelstein wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2020. It is operating and is owned by Windpark Wadern-Wenzelstein.

In 2024 it settled 25.3 GWh of electricity, a load factor of 28.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2040, after which that output is sold at market prices.

Measured performance vs peers
28.8%
This assetCohort median 23.8%Middle half

This asset produced at 28.8% of nameplate in 2024 — the 81st percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
10 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Windpark Wadern-Wenzelstein
Technology
Onshore
Measured output 2024
25.3 GWh
Load factor
28.8%
EEG support ends
2040
Peer percentile
81st
Grid connection
MS
State
Saarland

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE957579050106); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap