Solar farm

Dornstedt 2.1 solar project

Dornstedt 2.1 solar project is a solar farm in Germany with a capacity of 1.1 MW, commissioned in 2020. It is operating and is owned by ENERPARC Solar Invest 138 GmbH.

In 2024 it settled 999 MWh of electricity, a load factor of 10.4%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
10.4%
This assetCohort median 9.7%Middle half

This asset produced at 10.4% of nameplate in 2024 — the 66th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
1.1 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
ENERPARC Solar Invest 138 GmbH
Technology
PV
Measured output 2024
999 MWh
Load factor
10.4%
Peer percentile
66th
Grid connection
MS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE952457719069); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap