Solar farm

Ehndorf 1.2 solar project

Ehndorf 1.2 solar project is a solar farm in Germany with a capacity of 6.6 MW, commissioned in 2023. It is operating and is owned by pvwerk Solarpark TU 3 GmbH.

In 2024 it settled 5.0 GWh of electricity, a load factor of 8.7%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
8.7%
This assetCohort median 9.7%Middle half

This asset produced at 8.7% of nameplate in 2024 — the 32nd percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
6.6 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
pvwerk Solarpark TU 3 GmbH
Technology
PV
Measured output 2024
5.0 GWh
Load factor
8.7%
EEG support ends
2043
Peer percentile
32nd
Grid connection
HS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE989733409970); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets