Solar farm

PVA Guben II Teil Ausschreibung solar project

PVA Guben II Teil Ausschreibung solar project is a solar farm in Germany with a capacity of 4.4 MW, commissioned in 2023. It is operating and is owned by FEH Solarpark 34 GmbH & Co. KG.

In 2024 it settled 4.5 GWh of electricity, a load factor of 11.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
11.8%
This assetCohort median 9.7%Middle half

This asset produced at 11.8% of nameplate in 2024 — the 90th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
4.4 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
FEH Solarpark 34 GmbH & Co. KG
Technology
PV
Measured output 2024
4.5 GWh
Load factor
11.8%
EEG support ends
2043
Peer percentile
90th
Grid connection
MS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE901965261744); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets