Solar farm

SKWS solar project

SKWS solar project is a solar farm in Germany with a capacity of 1 MW, commissioned in 2014. It is operating and is owned by Solarkraftwerk Selke-Aue UG (haftungsbeschränkt) & Co. KG.

In 2024 it settled 494 MWh of electricity, a load factor of 5.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2034, after which that output is sold at market prices.

Measured performance vs peers
5.6%
This assetCohort median 10.5%Middle half

This asset produced at 5.6% of nameplate in 2024 — the 3rd percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
1 MW
Country
Germany
Status
operating
Commissioned
2014
Owner
Solarkraftwerk Selke-Aue UG (haftungsbeschränkt) & Co. KG
Technology
PV
Measured output 2024
494 MWh
Load factor
5.6%
EEG support ends
2034
Peer percentile
3rd
Grid connection
MS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE957360037040); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap