Solar farm

Solarpark Atzenhof solar project

Solarpark Atzenhof solar project is a solar farm in Germany with a capacity of 1 MW, commissioned in 2003. It is operating and is owned by Stadt Fürth.

In 2024 it settled 943 MWh of electricity, a load factor of 10.8%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
10.8%
This assetCohort median 10.4%Middle half

This asset produced at 10.8% of nameplate in 2024 — the 56th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
1 MW
Country
Germany
Status
operating
Commissioned
2003
Owner
Stadt Fürth
Technology
PV
Measured output 2024
943 MWh
Load factor
10.8%
Peer percentile
56th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE969197378838); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets