Solar farm

Solarpark Greiling An der Mühlleiten solar project

Solarpark Greiling An der Mühlleiten solar project is a solar farm in Germany with a capacity of 2.2 MW, commissioned in 2023. It is operating and is owned by Solarpark Greiling An der Mühlleiten GmbH.

In 2024 it settled 2.5 GWh of electricity, a load factor of 12.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
12.8%
This assetCohort median 9.7%Middle half

This asset produced at 12.8% of nameplate in 2024 — the 98th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
2.2 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Solarpark Greiling An der Mühlleiten GmbH
Technology
PV
Measured output 2024
2.5 GWh
Load factor
12.8%
EEG support ends
2043
Peer percentile
98th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE911489904430); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets