Solar farm

Solarpark Niedermittlau solar project

Solarpark Niedermittlau solar project is a solar farm in Germany with a capacity of 6.1 MW, commissioned in 2023. It is operating and is owned by Landwert VerwaltungsGmbH.

In 2024 it settled 12.0 GWh of electricity, a load factor of 22.4%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
22.4%
This assetCohort median 9.7%Middle half

This asset produced at 22.4% of nameplate in 2024 — the 100th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
6.1 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Landwert VerwaltungsGmbH
Technology
PV
Measured output 2024
12.0 GWh
Load factor
22.4%
EEG support ends
2043
Peer percentile
100th
Grid connection
HS/MS
State
Hessen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE967176034843); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets